Description
Application Instruction:
. Ensure the surface of stones to be bonded are clean, dry, and free from any dust, oil & debris.
. Apply a thin film of adhesive on one surface of stone using a suitable tool.
. Carefully position the other stone onto the adhesive-coated stone surface, aligning it as desired.
. Apply gentle pressure to ensure proper contact and remove any excess adhesive.
. Allow the adhesive to cure for minimum 30 minutes for initial grab and24 hours for obtaining full bond strength.
Additional Information:
Chemical Composition: MS Polymer based adhesive
Physical State: Semi Solid (Paste)
Curing Time: 24 hours at 250C
Hardening time: 3-4 hours
Specific Gravity: 1.20 g/ml
Pot life: 10 minutes at 250C
Working Temperature Range: -400C to 1200C
Reviews
There are no reviews yet.